Brack Construction

Case Study Details
6 Months
120 Tonne
£400,000
Project Overview
DPL Fabrications were appointed to detail, fabricate, and install the steel frame structure for a 6-storey apartment block on Longmore Lane, Liverpool. The £5 million development provides 26 new residential apartments, contributing to the city’s ongoing regeneration.
Scope of Work
- Connection Design – Developing buildable and safe steel connection solutions.
- Fabrication – Precision manufacturing of both primary and secondary steel members.
- Installation – Erection of the full frame on a logistically challenging site.
Demonstrated Capabilities
- Expertise in complex steel connection design to support multi-storey residential projects.
- Experience delivering projects adjacent to critical transport infrastructure, ensuring safety and compliance.
- Skilled project management coordinating design, fabrication, and site logistics.
- Adaptability to overcome restricted access and non-standard site geometries.
Solution & Outcome
This project presented unique challenges due to its location:
- The site was triangular in shape, requiring careful planning to optimise construction sequencing.
- Its proximity to the Merseyrail train line limited crane movement and lifting operations.
To overcome these constraints, DPL:
- Developed a construction plan to work methodically from the apex of the triangular site, minimising disruption and ensuring safety.
- Applied innovative lifting solutions to prevent crane encroachment into the rail corridor.
- Coordinated closely with stakeholders to maintain progress despite logistical limitations.
- The outcome was the successful delivery of a robust steel frame structure, completed safely, on schedule, and to the client’s specification.
Key Takeaways
- Effective planning and sequencing are critical when working in restricted and sensitive environments.
- Collaboration between design, fabrication, and site teams ensures delivery of complex multi-storey steel structures.
- DPL’s ability to adapt to site-specific challenges makes them a reliable partner for urban residential developments.
- Safety and efficiency can be maintained even on confined or irregularly shaped plots.
Contact us to see how we could bring your vision to life.
Testimonials

Edward Brack
Director
DPL are a great team to work with; they find solutions to the problems and carry out the works in a thoroughly professional way