Project Overview
DPL Fabrications was appointed by Bouygues to design, supply, and install all secondary steelwork for a series of high-specification data centre projects: LON 4, LON 5, LON 6, LON 7, LON 8, and LON 14. The nature of data centre construction demands precision, adaptability, and accelerated delivery, especially as these mission-critical facilities are often developed under tight timelines and changing requirements.
Scope of Work
DPL’s initial engagement began with the LON 5 project, where they were responsible for delivering a comprehensive package of secondary steelwork. Following the success and reliability demonstrated on LON 5, Bouygues extended DPL’s appointment across the subsequent LON 4, 6, 7, 8, and 14 projects, maintaining continuity and leveraging DPL’s growing familiarity with the complexities of live data centre sites. The scope across all data centres included:
- External gantry platforms with open mesh flooring
- Internal and external staircases and balustrades
- Generator access platforms
- Steel lift shafts
- Roof access structures
- All miscellaneous and supporting secondary steel installations
Demonstrated Capabilities
Design & Detailing
DPL design and detailing services, ensuring every element of secondary steel met both project specifications and regulatory standards. Leveraging 3D modelling and BIM coordination, DPL ensured integration with the primary structure and other disciplines such as MEP services and cladding. The fast-moving nature of these projects required rapid design development and value engineering solutions to address evolving site conditions. DPL’s detailing team adapted seamlessly, delivering drawings and fabrication models that were both accurate and construction-ready.
Fabrication & Welding
All steel elements were fabricated in DPL’s UK facility, where the company applied rigorous QA/QC procedures and coded welding techniques to ensure compliance with CE Marking and relevant British Standards. With a focus on reliability and speed, DPL’s just-in-time delivery model ensured that fabricated steel components were delivered to site precisely when required, minimising storage needs and reducing on-site congestion.
Steel Erection & Installation
DPL’s site teams handled full installation and erection of all secondary steelwork. Their operatives were fully qualified and accustomed to working in live, high-security data centre environments, adhering strictly to Bouygues’ site protocols and safety procedures.
The works were coordinated closely with the principal contractor and other trades to ensure efficient sequencing. Particular attention was paid to:
- Safe access at height
- Logistics within tight construction footprints
- Minimising disruption to other ongoing works
Solution & Outcome
The delivery of multiple data centre projects under Bouygues’ programmatic development plan demanded an agile, responsive, and experienced steelwork partner. DPL rose to the challenge by integrating closely with Bouygues’ project teams and adopting a proactive, solution-oriented approach across all stages of the project lifecycle. DPL’s established design-to-installation workflow, the projects benefitted from:
- Reduced coordination issues
- Improved buildability
- Rapid response to changes
- High-quality installation standards
- The success of DPL’s involvement on LON 5 led to a sustained and trusted partnership across five subsequent projects. Their demonstrated performance in high-pressure environments has cemented DPL’s position as a preferred secondary steelwork contractor within the mission-critical sector.
Key Takeaways
Over 6 major data centre projects delivered successfully with Bouygues
- Fully integrated steelwork package: Design, Detail, Fabrication, Installation
- Proven track record in fast-paced, changeable construction environments
- Expertise in secondary steel for high-spec data centre infrastructure
Need precision-engineered steelwork for critical projects? Contact us.
Testimonials

Sean Kenny
Senior Project Director, Bouygues
We have been partnering with DPL for several years, and the have consistently delivered excellent results. Their team is highly skilled, professional and always ready to tackle even the most challenging of projects. There ability to meet tight deadlines has made them a `first choice` partner for our construction projects