Brack Construction

DPL Fabrications - Civil Engineering Expertise for Nuclear Projects

Case Study Details

6 Months
120 Tonne
£400,000

Project Overview

DPL Fabrications were appointed to detail, fabricate, and install the steel frame structure for a 6-storey apartment block on Longmore Lane, Liverpool. The £5 million development provides 26 new residential apartments, contributing to the city’s ongoing regeneration.

Scope of Work

  • Connection Design – Developing buildable and safe steel connection solutions.
  • Fabrication – Precision manufacturing of both primary and secondary steel members.
  • Installation – Erection of the full frame on a logistically challenging site.

Demonstrated Capabilities

  • Expertise in complex steel connection design to support multi-storey residential projects.
  • Experience delivering projects adjacent to critical transport infrastructure, ensuring safety and compliance.
  • Skilled project management coordinating design, fabrication, and site logistics.
  • Adaptability to overcome restricted access and non-standard site geometries.

Solution & Outcome

This project presented unique challenges due to its location:

  • The site was triangular in shape, requiring careful planning to optimise construction sequencing.
  • Its proximity to the Merseyrail train line limited crane movement and lifting operations.

To overcome these constraints, DPL:

  • Developed a construction plan to work methodically from the apex of the triangular site, minimising disruption and ensuring safety.
  • Applied innovative lifting solutions to prevent crane encroachment into the rail corridor.
  • Coordinated closely with stakeholders to maintain progress despite logistical limitations.
  • The outcome was the successful delivery of a robust steel frame structure, completed safely, on schedule, and to the client’s specification.

Key Takeaways

  • Effective planning and sequencing are critical when working in restricted and sensitive environments.
  • Collaboration between design, fabrication, and site teams ensures delivery of complex multi-storey steel structures.
  • DPL’s ability to adapt to site-specific challenges makes them a reliable partner for urban residential developments.
  • Safety and efficiency can be maintained even on confined or irregularly shaped plots.

Contact us to see how we could bring your vision to life.

Testimonials

  • Edward Brack

    Director

    DPL are a great team to work with; they find solutions to the problems and carry out the works in a thoroughly professional way